Home › HVAC Thermostats & Zoning › Thermostat Parts › THERMOSTAT W LONG LEAD ELHFT1602 for Randell EL HFT1602
Thermostat Parts

THERMOSTAT W LONG LEAD ELHFT1602 for Randell EL HFT1602

Original price was: $138.30.Current price is: $41.49.

Availability: 9 in stock

🚚 Free Shipping over $58
✓ Premium Quality
🔒 Secure Payments
↻ Money Back Guarantee
SKU: EL HFT1602
CATEGORY: Thermostat Parts
Description

Product Description

This item for Randell MPN ELHFT1602 is a thermostat designed with a long lead for various applications. It is essential for maintaining optimal temperature settings in HVAC systems and refrigeration units. Made for reliable performance, this thermostat allows for precise control of temperature across a range of conditions.

  • Long lead design for easy installation.
  • Compatible with various refrigeration systems.
  • Durable construction for prolonged use.

Product Highlights

The Randell thermostat is suitable for HVAC technicians and refrigeration specialists who require dependable temperature control.

Product Information

Standard Information

  • Dim Weight: 1
  • Weight: 1
Technical Specifications

Length
7.45 inches

Width
5.1 inches

Height
2.3 inches

Product Information

Scroll to Top